Automotive
Bajaj Auto Achieves 35% Efficiency Through Complete Plant Digitalization
Digital transformation delivers ₹1.5 crores in annual savings and 50% faster decision-making
Duration
7 months
Team Size
14 engineers


Bajaj Auto
A leading two- and three-wheeler manufacturer in India
5 min read
Published 5/20/2024
The Challenge
Bajaj Auto faced siloed operations, limited real-time visibility into production, and manual processes slowing down decision-making and performance optimization.
Key Issues Identified:
- Disjointed systems with poor integration
- Manual data collection and reporting
- Lack of real-time production insights
- Slow response times to operational issues
- Limited scalability of legacy systems
Project Details
Industry
Automotive
Location
Pune, India
Project Duration
7 months
Team Size
14 engineers